Main purpose:
A double-girder top-running overhead crane has been implemented for a company manufacturing river and marine vessels. The crane is installed in the production workshop for lifting and handling large and long-length steel structures.
Two 10-tonne trolleys can operate independently or synchronously, ensuring load pick-up at two points, even load distribution and reduced skewing during transportation of sections.
The duty regime corresponds to medium-duty operation with a moderate number of lifting cycles.
SPECIFICATIONS:
|
Crane type |
КМАК 10+10-10,5 У3 |
| Crane construction | double girder overhead travelling crane |
| Crane lifting capacity |
10+10 t |
| Crane span |
10,5 m |
| Lifting height |
8 m |
| Crane travel speed with load |
0….31,7 m/min |
| Trolley traveling speed with load |
0….20 m/min |
| Frequency, voltage | 50 Hz / 380 V |
ADVANTAGES:
| For controlling the motors of the mechanisms (lifting, trolley traveling, and crane traveling), Altivar frequency converters manufactured by Schneider Electric are used. | |
| All drive mechanisms are equipped with gear motors from SEW-Eurodrive (Germany). |
We will calculate the cost of the equipment individually for you!
Contact expert