Main purpose:
For a company manufacturing pipes for heating and drainage systems, single-girder and double-girder underrunning overhead cranes have been installed. The cranes are integrated into the production cycle of pipe manufacturing and internal workshop storage operations.
The duty regime corresponds to medium-duty operation with a moderate number of duty cycles.
SPECIFICATIONS:
|
Crane type |
КМАКІ 3,0-9 У3 |
|
Crane construction |
bridge single-beam suspended |
| Crane lifting capacity |
3 t |
| Crane span |
8,98 m |
| Lifting height |
6 m |
|
Lifting speed of the nominal load |
4 m/min |
| Crane traveling speed |
0...20 m/min |
| Trolley traveling speed |
0...20 m/min |
|
Operating mode of the crane metal structure |
А3 |
|
Crane weight |
1,620 t |
| Frequency, voltage |
50 Hz, 380 V |
We will calculate the cost of the equipment individually for you!
Contact expert