Main purpose:
For a company manufacturing pipes for heating and drainage systems, single-girder and double-girder underrunning overhead cranes have been installed. The cranes are integrated into the production cycle of pipe manufacturing and internal workshop storage operations.
A distinctive feature of the project is a non-standard solution for supplying power to the freight trolley of the double-girder crane: power is provided via a conductor bar system. This solution made it possible to eliminate the need for a C-rail festoon cable system, thereby avoiding cable sagging and the risk of contact with process equipment in the workshop.
The duty regime corresponds to medium-duty operation with a moderate number of duty cycles.
SPECIFICATIONS:
| Type of crane | КМАКІІ 3,2-9 У3 |
| Crane design |
bridge double-girder suspended |
| Crane lifting capacity |
3,2 t |
| Crane span |
8,98 m |
| Lifting height |
5 m |
| Outreach of consoles (right, left) |
0,935 m |
| Crane traveling speed with load |
0….20 m/min |
| Crane weight | 2,260 t |